which options do you have to exclude a material from the MRP run?

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question.
A . Use a specific material status
B . Use a specific material group
C . Use a specific MRP type
D . Use a specific MRP list

Answer: C, D