Two PowerMax arrays have been configured for replication using SRDF During a disaster recovery operation production has been transferred to the R2 devices at the target site.
Which operation begins the transfer of accumulated invalid tracks from the R2s to the R1s while production work continues on the R2s?
A . Update
B. Fallback
C. Resume
D. Failover
Answer: B
Latest DES-1121 Dumps Valid Version with 69 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund