Which one of the following is the second step in System Analysis?

Which one of the following is the second step in System Analysis?
A . Feasibility Study
B . Select an alternative
C . Recommendation Review
D . Analysis and Design

Answer: A

Explanation:

The second step in System Analysis is to conduct a feasibility study, which is an assessment of the technical, economic, legal, operational, and schedule aspects of the proposed system. A feasibility study helps to determine whether the system is viable, beneficial, and achievable within the given constraints and resources. A feasibility study also helps to identify the risks, costs, benefits, and alternatives of the system.

Reference: 1, 2, 3

1: Certified IT Manager (CITM) Course Outline, EPI-AP, page 9 2: System Analysis vs System Design – What are the Differences?, GeeksforGeeks, section “Differences between System Analysis and System Design” 3: Step Response of Second Order System – Online Tutorials Library, TutorialsPoint, section “Follow these steps to get the response (output) of the second order system in the time domain.”

Latest CITM-001 Dumps Valid Version with 80 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments