Which one of the following is a characteristic of a penetration testing project?
A . The project is open-ended until all known vulnerabilities are identified.
B . The project schedule is plotted to produce a critical path.
C . The project tasks are to break into a targeted system.
D . The project plan is reviewed with the target audience.
Answer: C
Latest CISSP Dumps Valid Version with 981 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund