Which one of the following best describes the difference between a normal costing system and an actual costing system?

Which one of the following best describes the difference between a normal costing system and an actual costing system?
A . Direct labor cost is estimated using a predetermined rate under a normal costing system, while it is the actual value under an actual costing system.
B. Direct material cost is estimated using a predetermined rate under a normal costing system while it is the actual value under an actual costing system
C. Factory overhead cost is estimated using a predetermined rate under a normal costing system,while it is me actual value under an actual costing system.
D. Both direct labor cost and direct material cost are estimated using a predetermined rate under a normal costing system, while they are the actual value under an actual costing system

Answer: C