Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?
A . That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested.
B. That the functional specification accurately reflects requirements R1 and R2.
C. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels.
D. That the requirements for temperature control have been signed-off.
Answer: D