Exam4Training

Which of the following tasks are required to complete the project?

A server administrator set up a VM to be used in a lab setting. A technician is setting up thin-client computers to access this VM.

Which of the following tasks are required to complete the project? (Choose three.)
A . Connect the device to a printer.
B . Install the operating system.
C . Install a USB keyboard and mouse.
D . Connect the device to the network.
E . Install the latest system updates.
F . Install the latest device drivers.
G . Connect the device to a monitor.
H . Install the necessary applications.

Answer: D,E,H

Latest 220-1001 Dumps Valid Version with 718 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version