Which of the following steps are mandatory if you want to perform a transport from the development system to the production system(administration)? (2)
Which of the following steps are mandatory if you want to perform a transport from the development system to the production system(administration)? (2)
A . run a full optimization
B . select planning and consolidation objects in the BW transport collector
C . take the environment offline
D . run the transport-create request (UJBPCTR) transaction
Answer: C,D
Latest C_EPMBPC_11 Dumps Valid Version with 233 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments