Which of the following statement about the engineering parameters and the RF optimization process is correct?
A . Configuration data check -> check alarm -> check cell status -> drive test and data analysis
B. Check alarm -> configuration data check -> check cell status -> drive test and data analysis
C. Check alarm -> check cell status -> configuration data check -> drive test and data analysis
D. Check cell status -> configuration data check -> check alarm -> drive test and data analysis
Answer: A
Latest H35-521-ENU Dumps Valid Version with 268 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund