The customer has 20 cores E880, equipped with 2TB memory, of which ten cores and 1TB memory for permanent activation. They want to add new Linux workloads, need to use eight IFL cores and 64GB memory of the system.
Which of the following should be recommended to use the required core at the lowest cost?
A . Use the new IFLs to create a shared processor pool.
B . Use elasticity on demand to expand activation IFLs
C . using a common permanent activation to create a IFL shared processor pool.
D . Use utility program and expand on demand to activate the desired IFL cores.
Answer: A
Latest C1000-031 Dumps Valid Version with 304 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund