Which of the following production activity control (PAC) techniques focuses on optimizing output?

Which of the following production activity control (PAC) techniques focuses on optimizing output?
A . Gantt chart
B . Priority sequencing rules
C . Theory of constraints (TOC) scheduling
D . Critical path management (CPM)

Answer: C

Explanation:

Theory of constraints (TOC) scheduling is a PAC technique that focuses on optimizing output by identifying and managing the bottleneck or the constraint in the production system. TOC scheduling aims to maximize the throughput of the constraint while minimizing the inventory and operating expenses. Gantt chart, priority sequencing rules, and critical path management (CPM) are other PAC techniques, but they do not specifically focus on optimizing output. Gantt chart is a graphical tool that shows the planned and actual start and finish dates of activities. Priority sequencing rules are methods of determining the order of processing jobs based on criteria such as due date, slack time, or processing time. CPM is a network analysis technique that identifies the longest path of activities in a project and the minimum time required to complete it.

References:

APICS CPIM Part 2 Exam Content Manual, p. 29

[APICS CPIM Learning System Version 8.0], Module 4, Section C, p. 4-25

Latest CPIM-8.0 Dumps Valid Version with 150 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments