Exam4Training

Which of the following MUST a technician install along with the blades?

A technician needs to install six blade servers.

Which of the following MUST a technician install along with the blades?
A . Blade rail kits
B . Blade shelves
C . Blade enclosure
D . Blade station

Answer: C

Latest SK0-004 Dumps Valid Version with 780 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version