Which of the following is TRUE about Disaster Recovery Plan (DRP) testing?
A . Operational networks are usually shut down during testing.
B . Testing should continue even if components of the test fail.
C . The company is fully prepared for a disaster if all tests pass.
D . Testing should not be done until the entire disaster plan can be tested.
Answer: B
Latest CISSP Dumps Valid Version with 981 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund