Which of the following is required for an organization to properly manage its restore process in the event of system failure?
A . IRP
B . DRP
C . RPO
D . SDLC
Answer: B
Explanation:
A disaster recovery plan (DRP) is a set of policies and procedures that aim to restore the normal operations of an organization in the event of a system failure, natural disaster, or other emergency. A DRP typically includes the following elements:
A risk assessment that identifies the potential threats and impacts to the organization’s critical assets and processes.
A business impact analysis that prioritizes the recovery of the most essential functions and data. A recovery strategy that defines the roles and responsibilities of the recovery team, the resources and tools needed, and the steps to follow to restore the system.
A testing and maintenance plan that ensures the DRP is updated and validated regularly. A DRP is required for an organization to properly manage its restore process in the event of system failure, as it provides a clear and structured framework for recovering from a disaster and minimizing the downtime and data loss. Reference = CompTIA Security+ Study Guide (SY0-701), Chapter 7: Resilience and Recovery, page 325.