Which of the following is a prerequisite to ensure the explosion of a bill of material in the sales document?
A . For the sales document type, set the Bill of material explosion checkbox.
B . The item category of the main item must have the correct settings.
C . The schedule line category of the main item must have the correct settings.
D . The component item categories must be determined using the item usage: BO
Answer: B
Latest C_TSCM62_67 Dumps Valid Version with 93 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund