Exam4Training

Which of the following environmental constraints is MOST likely to rule out a possible site as an option?

A multinational corporation needs to migrate servers, which are supporting a national defense project, to a new datacenter. The data in question is approximately 20GB in size. The engineer on the project is considering datacenters in several countries as possible destinations. All sites in consideration are on a high-speed MPLS network (10Gb+ connections).

Which of the following environmental constraints is MOST likely to rule out a possible site as an option?
A . Downtime impact
B . Legal restrictions
C . Peak time frames
D . Bandwidth

Answer: B