Exam4Training

Which of the following ensures that project requirements are being met within project constraints?

Which of the following ensures that project requirements are being met within project constraints?
A . Schedule variance
B . Performance reporting
C . Scope management
D . Change management

Answer: C

Explanation:

Scope management ensures project requirements align with constraints, preventing scope creep and maintaining project focus. It involves defining, controlling, and validating project scope.

Reference: PMI. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide).

Latest INTE Dumps Valid Version with 167 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version