Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)
A . Assign costing variants to order type.
B . Propose a standard text key in work center.
C . Assign a production scheduling profile to the material master (product).
D . Enter formulas for costing in the work center.
E . Use an operation control key with the indicator costing-relevant.
Answer: A,D,E