Which of the following disaster recovery tests includes the operations that shut down at the primary site, and are shifted to the recovery site according to the disaster recovery plan?
A . Structured walk-through test
B . Simulation test
C . Full-interruption test
D . Parallel test
Answer: C
Latest CISSP-ISSAP Dumps Valid Version with 237 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund