Site icon Exam4Training

Which of the following descriptions of the RTT requirements between different PoDs is correct in the Multi-PoD scenario of the CloudFabric solution?

Which of the following descriptions of the RTT requirements between different PoDs is correct in the Multi-PoD scenario of the CloudFabric solution?
A . No more than 50ms
B . No more than 100ms
C . No more than 10ms
D . No more than 1s

Answer: A

Explanation:

Analysis: When using the Multi-PoD solution, it is recommended that the iMaster NCE-Fabric and the central DC device pull the RTT latency by <=50 ms. It is recommended that the iMaster NCE-Fabric and Edge DC Leaf extend the RTT latency by <=300 ms. If the active/standby disaster recovery deployment mode of iMaster NCE-Fabric controllers is used, the latency between controllers is < = 20 ms.

Exit mobile version