Which of the following are the Developers accountable for? (Choose the best two answers)
A . Selecting the Product Owner.
B . Organizing the work required to meet the Sprint Goal.
C . Creating a plan for the Sprint, the Sprint Backlog,
D . Reporting productivity.
Answer: B, C
Latest PSPO-I Dumps Valid Version with 481 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund