A company has been running off replicated, business-critical VMs at their disaster recovery location since an earthquake near the primary data center occurred. Since the threat has passed, they want to stop the replicas and switch to the VMs at the primary data center without losing data.
Which of the following actions is the first step they should take?
A . Failover
B . Permanent failover
C . Commit failback
D . Failback to production
E . Planned failover
F . Undo failover
Answer: D
Latest VMCE2021 Dumps Valid Version with 100 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund