You have two branches: Branch1 contains Job1, and Branch 2 contains Job 2. You want to copy Job1 to Branch 2 and preserve the change history when connecting Studio to Talend Administrator Center.
Which method should you use to preserve the change history?
A . Switch to Branch 1, right-click Job 1, select Copy to branch, and select Branch 2.
B . Switch to Branch 1, copy the Branch 1 job, switch to Branch 2, and paste the job into Branch 2.
C . Switch to branch 1, copy the Branch 1 Job, switch to Branch 2, and paste the Job into Branch 2.
D . Switch to Branch 1, copy lob 1, switch to Branch 2, and paste Job 1 over Job 2.
Answer: A
Explanation:
To copy Job1 from Branch1 to Branch2 and preserve the change history when connecting Studio to Talend Administration Center, you need to use the Copy to branch option. This option allows you to copy a job or a folder from one branch to another branch in the same project without losing the version history. You can access this option by switching to Branch1, right-clicking on Job1 in the Repository tree view, and selecting Copy to branch. This will open a dialog box where you can select Branch2 as the target branch and confirm the copy operation.
You do not need to use the import items, create standard job, or paste over options. These options are not used to copy jobs between branches and preserve the change history. The import items option is used to import items (such as jobs, metadata, routines, etc.) from an archive file that can be exported from another project or workspace. The create standard job option is used to create a new job with a name and a description. The paste over option is used to overwrite an existing job with another job that has been copied or cut from the same or another project.
Reference: Talend Open Studio: Open-source ETL and Free Data Integration | Talend, [Copy to branch – 7.3]
Latest Data Integration Developer Dumps Valid Version with 55 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund