Which job type goes active next?
A NetBackup Master Server has commenced writing four long-running duplication jobs on an AdvancedDisk disk pool. The value of Maximum concurrent jobs for the storage unit and Limit I/O streams for the disk pool are both set to 4.
There are 35 jobs queued on the Master Server that require this disk pool:
5 replication jobs with priority 9999
10 backup jobs with priority 999
20 duplication jobs with priority 99
Two restore jobs that require this disk pool are then submitted with default priority.
Which job type goes active next?
A . Backup
B. Duplication
C. Replication
D. Restore
Answer: D
Latest VCS-285 Dumps Valid Version with 235 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments