DRAG DROP
You create a Microsoft Power Platform solution. You create variables to define input values for the flow. You export the solution as managed and import the solution into a user acceptance testing (UAT) environment.
The flow in the UAT environment is still using the values from the development (DEV) environment.
You need to resolve the issue.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Latest PL-500 Dumps Valid Version with 43 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund