You are setting up an ACI spine-leaf architecture and interconnecting the spine switches with the leaf switches.
Which description of what happpen initial setup to activate these interlinks is true?
A . Fabric Path must be configured on the interlinks
B . The interlinks are Layer 2 connections and only the allowed VLAN list must be added.
C . The links are creating a Layer 3 network, and all links must be configured as point-to-point links.
D . An overlay is created automatically, which creates a setup where the uplinks do not need to be managed manually.
Answer: D
Latest 400-151 Dumps Valid Version with 145 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund