DRAG DROP
You need to determine the costing versions for the requirements.
Which costing versions should you use? To answer, drag the appropriate costing versions to the correct requirements. Each costing version may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Box 1: Planned
If a vendor can no longer deliver the raw materials for the energy drinks due to supply chain issues, the costs for using an alternative vendor to source the raw materials should be used to determine the impact on profits.
Planned costs
A costing version can contain a set of planned cost records about items and manufacturing processes. A costing version that contains planned costs is often used to support cost calculation simulations, such as simulations of the effect that cost changes to purchased materials or manufacturing processes has on the calculated costs of manufactured items. The item cost records for planned costs can also be used to support an actual cost inventory model by providing the initial values for item costs. These values include the calculation of planned costs for manufactured items.
Box 2: Standard
The profitability for nutritional supplements manufacturing processes needs to be expressed in terms of the cost categories for routing operations and the calculation formulas for manufacturing overheads.
Standard costs
A costing version can support a standard cost inventory model for items, where the costing version contains a set of standard cost records about items and manufacturing processes. Cost data about manufacturing processes is expressed in terms of the cost categories for routing operations and the calculation formulas for manufacturing overheads.