Which correction allows for a more efficient design?

Refer to the exhibit.

An engineer must provide a redesign for the distribution and access layers of the network.

Which correction allows for a more efficient design?
A . Change the link between Distribution Switch A and Distribution Switch B to be a routed link.
B . Reconfigure the Distribution Switch A to become the HSRP Active.
C . Create an EtherChannel link between Distribution Switch A and Distribution Switch
E . Add a link between Access Switch A and Access Switch

Answer: B

Latest 300-320 Dumps Valid Version with 725 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments