A retailer that uses Dynamics 365 Supply Chain Management is conducting master planning runs with 300,000 items in a single planned order run on average.
Optimizations are needed to improve performance. Most of the items in the master planning runs do not have dependencies on the other items.
Planning multiple items together in a single group will help with performance.
You need to configure the system to increase performance.
Which configuration should you use?
A . Number of tasks in a helper bundle
B. Number of threads
C. Use of cache
D. Time fences
E. Number of orders in a firming bundle
Answer: A
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/master-planning-performance