Refer to the exhibit.
An engineer applied the summarization configuration on R1 for four networks
(192.168.20.0/24 to 192.168.23.0/24) in area 1 and eight networks (192.168.32.0/24 to 192.168.39.0/24) in area 2 to stop the flooding of all the customer routes. While checking the routing table of R2, the engineer noticed that R1 is still sending only specific routes to R2 .
Which configuration should the engineer apply on R1 to summarize routes?
A . Option A
B. Option B
C. Option C
D. Option D
Answer: C