Exam4Training

Which configuration should be applied to meet the requirement?

A network engineer must configure a power redundancy policy on a Cisco UCS C-Series Rack Server. The power redundancy must support two power sources being used to power the server.

Which configuration should be applied to meet the requirement?

A . Option A
B. Option B
C. Option C
D. Option D

Answer: D

Explanation:

https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ucs-manager/CLI-User-Guides/Server-Mgmt/3-1/b_Cisco_UCS_Manager_Server_Mgmt_CLI_Guide/power_mgmt.html

The command "N+1" is invalid. The command should be "n-plus-1"

Latest 350-601 Dumps Valid Version with 138 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version