Which configuration should be applied to meet the requirement?
A network engineer must configure a power redundancy policy on a Cisco UCS C-Series Rack Server. The power redundancy must support two power sources being used to power the server.
Which configuration should be applied to meet the requirement?
A . Option A
B. Option B
C. Option C
D. Option D
Answer: D
Explanation:
https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ucs-manager/CLI-User-Guides/Server-Mgmt/3-1/b_Cisco_UCS_Manager_Server_Mgmt_CLI_Guide/power_mgmt.html
The command "N+1" is invalid. The command should be "n-plus-1"