Which configuration should be applied after the Physical connection is established?

A Cisco UCS C-Series server is installed at a data center. The server should be managed by the Cisco UCS Manager by using a single cable for management and data traffic.

Which configuration should be applied after the Physical connection is established?
A . UCS-A# scope server 1
UCS-A /server# scope cimc
UCS-A /server/cimc # scope mgmt-conn sideband
UCS-A /server/cimc # mgmt-conn-state enabled
UCS-A /server/cimc/mgmt-conn* # commit-buffer
B. UCS-A# scope chassis 1
UCS-A /chassis# scope cimc
UCS-A /chassis/cimc # scope mgmt-conn sideband
UCS-A /chassis/cimc/mgmt-conn # mgmt-conn-state enabled
UCS-A /chassis/cimc/mgmt-conn* # commit-buffer
C. UCS-A# scope chassis 1
UCS-A /chassis# scope cimc
UCS-A /chassis /cimc # set mgmt-conn-state enabled
UCS-A /chassis /cimc/mgmt-conn* # commit-buffer
D. UCS-A# scope server 1
UCS-A /server# scope cimc
UCS-A /server/cimc # scope mgmt-conn sideband
UCS-A /server/cimc/mgmt-conn #set mgmt-conn-state enabled
UCS-A /server/cimc/mgmt-conn* # commit-buffer

Answer: D

Explanation:

Example

UCS-A# scope server 1

UCS-A /server # scope cimc

UCS-A /server/cimc # scope mgm

UCS-A /server/cimc # scope mgmt-conn

UCS-A /server/cimc # scope mgmt-conn sideband

UCS-A /server/cimc/mgmt-conn # set mgmt-conn-state enabled

UCS-A /server/cimc/mgmt-conn* # commit-buffer

UCS-A /server/cimc/mgmt-conn

https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/c-series_integration/ucsm3-1/b_C-Series-Integration_UCSM3-1/b_C-Series-Integration_UCSM3-1_chapter_010.html

Latest 350-601 Dumps Valid Version with 138 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments