Initial Stakeholder Interview Findings
In addition to the goals summarized in the previous section, the following are findings from initial interviews with the key stakeholders and an analysis of their service level agreements.
– The design must use the F5 Loadbalancer and should be as redundant as possible.
– Qualified IT personal is hard to find these days. If possible, reduce operational costs and try to automate or outsource basic IT-tasks.
– ACME is very particular about meeting the go-live date. If there are unforeseen delays, the project may not be delivered for the required go-live date
Which component needs to be implemented if ACME wants to a seamlessly login into the Horizon View Desktop when accessing it externally with a certificate-based authentication?
A . True SSO
B . Security Server
C . Provisioning Server
D . Integration Broker
Answer: A
Latest 5V0-62.19 Dumps Valid Version with 63 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund