Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
A . Archiving of documents for assembly scrap
B . Posting of production costs to the production cost collector
C . Reduction of associated capacity requirements
D . Material staging for next order in sequence
E . Posting of goods receipt for the product

Answer: B,C,E