Which action should the administrator complete next to meet these requirements?
The CTO releases a new company policy stating that all workloads need to be managed through vRealize Automation (vRA) so that access to day 2 operations can be controlled centrally through a policy. Prior to this policy, the App-Dev team deployed all of their 300 development and test workloads within a single public cloud vendor.
The naming convention used for workloads is provided in the following table:
The App-Dev team needs to onboard all of the running development workloads into vRA and allocate them to the App-Dev project. The administrator creates a new Onboarding
Plan and specifies the correct project and cloud account.
Which action should the administrator complete next to meet these requirements?
A . Add 2 filtering rules, with Rule 1 criteria as “name:dev” and Rule 2 criteria as “status:on”.
B . Add 1 filtering rule and combine the criteria “name:test” and “status:off”.
C . Add 1 filtering rule and combine the criteria “name:dev” and “status:on”.
D . Add 2 filtering rules, with Rule 1 criteria as “name:test” and Rule 2 criteria as “status:on”.
Answer: C
Explanation:
https://docs.vmware.com/en/vRealize-Automation/8.1/Using-and-Managing-Cloud-Assembly/GUID-7378C2F1-1AA3-47BB-AB5B-9E0480893D35.html
Latest 2V0-31.20 Dumps Valid Version with 87 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund