Exam4Training

Which action must be taken?

An engineer is implementing NPV mode on a Cisco MDS 9000 Series Switch.

Which action must be taken?
A . The FCNS database must be disabled in the fabric.
B . A port channel must be configured to the upstream switch.
C . All switches in the fabric must be Cisco MDS switches.
D . NPIV must be enabled on the upstream switch.

Answer: D

Latest 350-601 Dumps Valid Version with 138 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version