You are expanding an existing cluster that uses BES-53248 cluster interconnect switches. You connected the new controllers to ports 0/17 through 0/20. However, you are unable to join the new nodes to the cluster.
Which action must be taken to solve the problem?
A . Install the license file.
B. Install the CSHM configuration file.
C. Install the reference configuration file.
D. Reboot the controllers.
Answer: A
Explanation:
Reference: https://github.com/NetAppDocs/ontap-systems-switches/blob/main/switch-bes-53248/migrate_to_2n_switched_overview.adoc
Latest NS0-184 Dumps Valid Version with 60 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund