When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?
When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?
A . Perform a preliminary water budget analysis before the completion of schematic design
B . Install permanent metering on both the water sources and the waste water leaving the site
C . At the completion of schematic design, count the fixtures and apply the maximum flow rate
D . Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building
Answer: A
Explanation:
When using the Integrative Process, the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project is to perform a preliminary water budget analysis before the completion of schematic design. This analysis should include the following steps1:
Identify the project’s water sources and uses, such as potable water, reclaimed water, rainwater, graywater, blackwater, irrigation, cooling towers, etc.
Estimate the baseline water consumption for each use based on the applicable codes, standards, and benchmarks.
Identify potential water conservation strategies that can reduce the demand or increase the supply of water, such as low-flow fixtures, native landscaping, rainwater harvesting, graywater reuse, etc. Evaluate the feasibility, cost-effectiveness, and environmental benefits of each strategy using a life-cycle approach.
Select the most appropriate strategies and document how they inform the design decisions and meet the project goals.
Compare the projected water consumption with the baseline and calculate the percentage reduction.
Performing a preliminary water budget analysis before the completion of schematic design allows the LEED AP to identify opportunities for water efficiency and innovation early in the design process. It also helps to optimize the integration of water systems with other building and site systems, such as energy, materials, indoor environmental quality, etc. Moreover, it supports the achievement of other LEED credits related to water efficiency, such as WE Prerequisite 1: Outdoor Water Use Reduction, WE Prerequisite 2: Indoor Water Use Reduction, WE Credit 1: Outdoor Water Use Reduction, WE Credit 2: Indoor Water Use Reduction, WE Credit 3: Cooling Tower Water Use2.
Reference: Understanding Integrative Design in LEED v41