Exam4Training

When should the Developers on a Scrum Team be replaced? (choose the best answer)

When should the Developers on a Scrum Team be replaced? (choose the best answer)
A . Every Sprint to promote shared learning.
B. As needed with no special allowance for changes in productivity.
C. Never it reduces productivity.
D. As needed while taking into account a short-term reduction in productivity.

Answer: D

Latest PSD-I Dumps Valid Version with 166 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version