When procuring a machinery, at which stage buyer must check whether it is working to the standards set out in the design specification?

When procuring a machinery, at which stage buyer must check whether it is working to the standards set out in the design specification?
A . Installation
B . Maintenance and repair activities
C . Customer support
D . Manufacture

Answer: A

Explanation:

Through-life Management involves the life-cycle management of the products, services and activities required to deliver a fully integrated capability to the customer, while reducing the cost of ownership for the customer.

Source: Andrew Graves

The installation stage occurs in In-Service Operations. At this stage, the machinery is shipped and installed on the buyer’s premises and check to ensure that it is working to the standards set out in the design specification.

Reference: CIPS study guide page 130

LO 3, AC 3.2

Latest L4M2 Dumps Valid Version with 144 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments