When prioritizing Six Sigma projects within an organization:
A . The project with the statistically lowest sigma level should always be prioritized
B . The project with the highest potential cost savings should always be prioritized.
C . The project with the highest potential customer satisfaction increase should always be prioritized.
D . All of the above should be considered and statistically researched before choosing the best option for the organization at hand.
Answer: D