When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)
When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)
A . Taxes
B . Permits
C . Inspection
D . Licensing
E . Safety
Answer: B, C