When installing the Huawei air-cooled air conditioner, the refrigerant pipeline positive pressure is required to be () hours.

When installing the Huawei air-cooled air conditioner, the refrigerant pipeline positive pressure is required to be () hours.
A . 8
B . 12
C . 24
D . 36

Answer: C