When engineers deliver a hyper-converged virtualization scenario built with Huawei E9000 blade servers, they need to use CX310 or CX320 switch boards, through basic frame cascading, without external switches. A maximum of 4 frames are supported between frames. Two switch boards in the frame are stacked through 40G interfaces.
When engineers deliver a hyper-converged virtualization scenario built with Huawei E9000 blade servers, they need to use CX310 or CX320 switch boards, through basic frame cascading, without external switches. A maximum of 4 frames are supported between frames. Two switch boards in the frame are stacked through 40G interfaces.
A . True
B . False
Answer: A
Latest H13-231_V1.0-ENU Dumps Valid Version with 514 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments