Exam4Training

When does the next replication job start?

An administrator has two offices in different cities with Auto Image Replication (AIR) implemented to replicate the backups from one office location to the other location using Storage Lifecycle Policy (SLP). Multiple small servers are backed up daily, which results in many replication jobs in the environment.

The Storage Lifecycle Policy (SLP) parameters are:

SLP.MIN_SIZE_PER_REPLICATION_JOB = 20 GB

SLP.MAX_TIME_TIL_FORCE_SMALL_REPLICATION_JOB = 60 MINUTES

After modifying the SLP parameters, three backup jobs are completed and the size of each backup job is 5 GB. A backup window has closed, and no new backup jobs will occur.

When does the next replication job start?
A . when the force interval for small replication jobs time is reached
B . when the replication job batch size is 20 GB
C . 75 minutes after the backup jobs have finished
D . immediately after the backup jobs have finished

Answer: A

Latest VCS-285 Dumps Valid Version with 235 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version