When creating a scheduled report which field needs to be changed so the desired information is available in the report?

When creating a scheduled report which field needs to be changed so the desired information is available in the report?
A . Recipients
B . Report Title
C . Report Type
D . Schedule

Answer: C

Explanation:

According to the Reports document1, the Report Type field determines what kind of information is captured in the report. There are different report types available, such as Application Health Report, Dashboard Report, Controller Audit Report, and so on. Each report type has different fields in the Report Data tab that can be customized. Therefore, to get the desired information in the report, you need to select the appropriate Report Type from the dropdown menu when creating a scheduled report.

Reference: Reports