When configuring the Nexus switches for FCoE connectivity, which two actions are required?
An administrator wants to implement FCoE for connectivity of an AFF A200 using VLAN 3011 for fabric traffic across VSAN 11.
When configuring the Nexus switches for FCoE connectivity, which two actions are required?(Choose two.)
A . Create a new virtual FC interface and bind the physical interface to it.
B.Add the virtual interface to the VSAN.
C.Create a port channel and add all of the physical network ports that will have FCoE LIFs.
D.Add the adapter MAC address to the network port configuration where the node is connected.
Answer: BA
Latest NS0-520 Dumps Valid Version with 334 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments