When are the finished goods packed onto handling units in SAP Best Practice SAP EWM Integration – Delivery-Based Production Integration (2VM)?
When are the finished goods packed onto handling units in SAP Best Practice SAP EWM Integration – Delivery-Based Production Integration (2VM)?
A . When processing the expected goods receipt document in SAP S/4HANA Cloud
B. After the confirmation of the putaway tasks in SAP EWM
C. After the goods receipt for the inbound delivery is posted in SAP EWM
D. When the packing operation in the production order is confirmed in SAP S/4HANA Cloud
Answer: C
Latest C_S4CWM_2202 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments