A company classifies items as A, B, C, and D for planning purposes.
You run Planning Optimization for the C items with the following setup:
• a plan filter for the A, B, and D items
• a runtime filter for the C items
The Planning Optimization output does not create any planned orders.
You need to produce results in Planning Optimization for the C items without affecting the A, B, and D items.
What should you do? Select only one answer.
A . Add the C items to the existing plan filter for the A, B, and D items. Set up a runtime filter for the A, B, and D items.
B. Create a master plan with plan filter for the C items only. Do not set up a runtime filter for C items.
C. Create a master plan with no plan filter or runtime filter. Add an advanced filter for the C items on the planned orders.
D. Create a dynamic plan and a static plan. Do not set up plan filters or runtime filters.
E. Retain the existing plan filter for the A, B, and D items. Set up a runtime filter for the A and C items.
Answer: C
Latest MB-330 Dumps Valid Version with 198 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund